When to start
Start Before
Someone Else Finds It.
The free review is most useful right after one of these, while there is still time to act on what it finds.
Equipment changes
New equipment went in.
Lines were added, moved or automated. The drawings, permits, labels and electrical capacity were sized for the old layout.
Check what changedInspections
An inspection or survey is coming.
Fire marshal, building, licensing or a customer audit. Find what the inspector will find while there is still time to fix it.
Get ahead of itInsurance
Your insurer sent a list.
Open loss-control recommendations and a renewal coming up. Turn the carrier's list into a closed, documented one.
Close out the listOwnership
You bought or took over a facility.
Get a baseline of what you actually own: what is permitted, what changed since, and what it costs to run.
Get a baselineFor manufacturing, food and beverage, warehouse and distribution, healthcare and care facilities, and data centers.
What the free review covers
More Than Drawings and Permits.
A Review of the Whole Facility.
We read your records against each other, then read your equipment and utility data against how the facility should run.
Records and compliance
- Drawings against permits and the certificate of occupancy
- Equipment list against what is on file
- Labels and approvals that no longer match the equipment
- Changes over time that were never documented
Efficiency and risk
- Power supplied against what equipment requires
- Possible leaks, from water use and maintenance history
- Compressed air, energy and water use that looks out of line
- Safety exposure where records and equipment disagree
Findings are based on the documents and data you send. Step 2 confirms them in the field.
What a Records Review Finds
Paperwork, Equipment and Bills.
Read Together.
Field conditions first. Coordinated engineering follows.
| Item | What the records say | What we found | Status |
|---|---|---|---|
| Air handler AHU-2 | Drawn in one location | Installed in another | Records mismatch |
| Line 1 motor | Circuit sized for the original equipment | New equipment needs more power | Power mismatch |
| Process water | Water bills rising month over month | No new load to explain it | Possible leak |
| Equipment label | Label on file for the original unit | Unit modified since | Label out of date |
| Item | What the records say | What we found | Status |
|---|---|---|---|
| Smoke barrier, east wing | Rated wall on the life safety plan | Renovation added penetrations with no firestopping record | Records mismatch |
| Procedure room | Ventilation designed for exam use | Room now used for procedures | Ventilation mismatch |
| Sprinkler coverage | Drawn for the original floor plan | Walls added in the last renovation | Coverage gap |
| Emergency power | Generator sized for the original equipment | Imaging equipment added since | Power mismatch |
Illustrative example, not client data. Findings are flagged from the documents and data you send. The site walk in step 2 confirms each one in the field.
Three steps
Review. Plan. Fix.
Decide at Every Step.
Free records review
Review the whole facility on paper
Records checked against each other, and utility data checked against what your equipment should draw and use.
Site walk and fix plan
Confirm it, rank it, present it
We walk the floor, confirm what is installed and measure utilities. Every fix is ranked by cost saved and risk removed, then presented to you.
Delivery of the fixes
Permit, build, close out
The fixes you approve are permitted, built and closed out by one team, with licensed partners for electrical and engineering scopes.
You choose what happens after each step. Start with the documents you already have.
Also available on their own
You do not need the program to get these. They are also included in step 2 where your equipment needs them.
Field evaluation and labeling
Field evaluation for unlisted, imported or modified equipment, coordinated with NRTL partners.
Field verification
A site walk to confirm what is actually installed and operating, measured against your drawings, permits and equipment list.
Cost-center flow
Find the Cost Hiding
Between Systems.
Individual symptoms are easy to ignore. Put into one facility-wide decision path, they become a ranked list of fixes.
Steps 1 and 2
Records and field facts
What is on file, and what is actually installed.
Step 2
Cost Improvement Plan
Every fix on one list, ranked by cost saved and risk removed.
More than an audit
A Report Ends.
A Program Keeps Going.
A typical audit
- Ends at a findings report
- Lists problems without ranking them by cost
- Asks you to fund everything or nothing
- Leaves you to find the people who will fix it
The ACNA program
- Starts free and continues only when you choose
- Ranks every fix by cost saved, risk removed and emissions avoided
- Lets you decide at every step what happens next
- Permits and builds the fix with the same team
Verification and compliance
Savings That Can
Survive Review.
A plan is only worth the paper if its recommendations hold up through engineering review, field verification and installation.
Field evaluation and labeling
Coordinate equipment readiness and field conditions with NRTL partners before compliance becomes a startup delay.
Compliance assessment
Code, safety, permit and operational risk go into the same ranking as cost.
Engineering continuity
The field baseline stays connected to design decisions, review and closeout documents.
Questions
Before You Send
Your Drawings.
Why is the records review free?
Because it is how most facilities decide whether a site walk is worth it. We earn our fee when you hire us for step 2 or the fixes. If you stop after step 1, you keep the findings and owe nothing.
What do I need to send?
Whatever you have: drawings or as-builts, permits, certificate of occupancy, the equipment list, recent utility bills and maintenance records. A partial set is fine. Missing records are a finding too.
Who sees my documents?
The ACNA team, and our partner engineering firm where a finding needs engineering judgment. We can sign an NDA before you send anything.
How long does it take?
It depends on the size of the facility and how many records there are. We give you a delivery date once your documents arrive.
What do I get?
A written list of findings. Each one shows what the records say, what we found, and what it may cost you in compliance, safety and efficiency. Then a call to walk through them.
What does step 2 cost?
It depends on the facility and on what step 1 found. You get a fixed fee in writing before we start, and nothing happens without your approval.
Do I have to continue after step 1?
No. You decide after each step. You can stop, take on one fix, or ask us for a single service such as field evaluation.
Get Started
Find the Gap
Before Someone Else Does.
Step 1 is free and uses the documents you already have. A person replies within one business day.
- 1A person from ACNA replies within one business day.
- 2You send your files the way that suits you. We can sign an NDA first.
- 3We review them and give you a delivery date for the findings.
- 4We walk you through each finding and what it costs. You decide what happens next.
Have a defined project instead? Start a project.
Your request is ready to send
Copy the request below and email it to us, or call. A person replies within one business day.