ACNA GROUP

Cost Improvement Program

Build the case
before you build the fix.

Find where your facility no longer matches its drawings, permits and labels before an inspector, insurer or failure does. Then get a ranked, documented plan to fix it, priced one step at a time.

Start free. You decide what happens after each step.

Step 1 is free

Start with the documents you already have.

Send drawings, permits, certificate of occupancy, your equipment list and recent utility bills. No site visit and no commitment.

When to start

Start Before
Someone Else Finds It.

The free review is most useful right after one of these, while there is still time to act on what it finds.

Equipment changes

New equipment went in.

Lines were added, moved or automated. The drawings, permits, labels and electrical capacity were sized for the old layout.

Check what changed

Inspections

An inspection or survey is coming.

Fire marshal, building, licensing or a customer audit. Find what the inspector will find while there is still time to fix it.

Get ahead of it

Insurance

Your insurer sent a list.

Open loss-control recommendations and a renewal coming up. Turn the carrier's list into a closed, documented one.

Close out the list

Ownership

You bought or took over a facility.

Get a baseline of what you actually own: what is permitted, what changed since, and what it costs to run.

Get a baseline

For manufacturing, food and beverage, warehouse and distribution, healthcare and care facilities, and data centers.

What the free review covers

More Than Drawings and Permits.
A Review of the Whole Facility.

We read your records against each other, then read your equipment and utility data against how the facility should run.

Records and compliance

  • Drawings against permits and the certificate of occupancy
  • Equipment list against what is on file
  • Labels and approvals that no longer match the equipment
  • Changes over time that were never documented

Efficiency and risk

  • Power supplied against what equipment requires
  • Possible leaks, from water use and maintenance history
  • Compressed air, energy and water use that looks out of line
  • Safety exposure where records and equipment disagree

Findings are based on the documents and data you send. Step 2 confirms them in the field.

What a Records Review Finds

Paperwork, Equipment and Bills.
Read Together.

Field conditions first. Coordinated engineering follows.

Illustrative example of records review findings at a plant
ItemWhat the records sayWhat we foundStatus
Air handler AHU-2Drawn in one locationInstalled in anotherRecords mismatch
Line 1 motorCircuit sized for the original equipmentNew equipment needs more powerPower mismatch
Process waterWater bills rising month over monthNo new load to explain itPossible leak
Equipment labelLabel on file for the original unitUnit modified sinceLabel out of date

Illustrative example, not client data. Findings are flagged from the documents and data you send. The site walk in step 2 confirms each one in the field.

Three steps

Review. Plan. Fix.
Decide at Every Step.

  1. Free records review

    Review the whole facility on paper

    Records checked against each other, and utility data checked against what your equipment should draw and use.

    You get
    Record mismatches and efficiency flags, based on documents provided
    Price
    Free
  2. Site walk and fix plan

    Confirm it, rank it, present it

    We walk the floor, confirm what is installed and measure utilities. Every fix is ranked by cost saved and risk removed, then presented to you.

    You get
    A verified baseline and the ranked fix plan, reviewed and sealed by a licensed partner PE where required
    Price
    Fixed fee, quoted in writing before we start
  3. Delivery of the fixes

    Permit, build, close out

    The fixes you approve are permitted, built and closed out by one team, with licensed partners for electrical and engineering scopes.

    You get
    Completed fixes, a closeout record and as-builts
    Price
    Priced per fix you approve
Start With Step 1

You choose what happens after each step. Start with the documents you already have.

Also available on their own

You do not need the program to get these. They are also included in step 2 where your equipment needs them.

Field evaluation and labeling

Field evaluation for unlisted, imported or modified equipment, coordinated with NRTL partners.

Field verification

A site walk to confirm what is actually installed and operating, measured against your drawings, permits and equipment list.

Cost-center flow

Find the Cost Hiding
Between Systems.

Individual symptoms are easy to ignore. Put into one facility-wide decision path, they become a ranked list of fixes.

Energy
Compressed air
Water
Maintenance
Compliance

Steps 1 and 2

Records and field facts

What is on file, and what is actually installed.

Step 2

Cost Improvement Plan

Every fix on one list, ranked by cost saved and risk removed.

Savings
Compliance restored
Risk removed

More than an audit

A Report Ends.
A Program Keeps Going.

A typical audit

  • Ends at a findings report
  • Lists problems without ranking them by cost
  • Asks you to fund everything or nothing
  • Leaves you to find the people who will fix it

The ACNA program

  • Starts free and continues only when you choose
  • Ranks every fix by cost saved, risk removed and emissions avoided
  • Lets you decide at every step what happens next
  • Permits and builds the fix with the same team

Verification and compliance

Savings That Can
Survive Review.

A plan is only worth the paper if its recommendations hold up through engineering review, field verification and installation.

Field evaluation and labeling

Coordinate equipment readiness and field conditions with NRTL partners before compliance becomes a startup delay.

Compliance assessment

Code, safety, permit and operational risk go into the same ranking as cost.

Engineering continuity

The field baseline stays connected to design decisions, review and closeout documents.

Questions

Before You Send
Your Drawings.

Why is the records review free?

Because it is how most facilities decide whether a site walk is worth it. We earn our fee when you hire us for step 2 or the fixes. If you stop after step 1, you keep the findings and owe nothing.

What do I need to send?

Whatever you have: drawings or as-builts, permits, certificate of occupancy, the equipment list, recent utility bills and maintenance records. A partial set is fine. Missing records are a finding too.

Who sees my documents?

The ACNA team, and our partner engineering firm where a finding needs engineering judgment. We can sign an NDA before you send anything.

How long does it take?

It depends on the size of the facility and how many records there are. We give you a delivery date once your documents arrive.

What do I get?

A written list of findings. Each one shows what the records say, what we found, and what it may cost you in compliance, safety and efficiency. Then a call to walk through them.

What does step 2 cost?

It depends on the facility and on what step 1 found. You get a fixed fee in writing before we start, and nothing happens without your approval.

Do I have to continue after step 1?

No. You decide after each step. You can stop, take on one fix, or ask us for a single service such as field evaluation.

Get Started

Find the Gap
Before Someone Else Does.

Step 1 is free and uses the documents you already have. A person replies within one business day.

Fields marked * are required. We review the documents and data you have; no site visit is needed for step one.

Documents you can share
You send the files after we reply. Nothing uploads from this form.
Reply within one business day

We use what you send only to answer this request, and we never sell it. Privacy policy.

  1. 1A person from ACNA replies within one business day.
  2. 2You send your files the way that suits you. We can sign an NDA first.
  3. 3We review them and give you a delivery date for the findings.
  4. 4We walk you through each finding and what it costs. You decide what happens next.

Have a defined project instead? Start a project.