Who We Serve
Facilities That Change
Faster Than Their Records.
Most facilities call us after one of these. Each is a reason to check your records before someone else does.
Equipment changes
New equipment went in.
Lines were added, moved or automated. The drawings, permits, labels and electrical capacity were sized for the old layout.
Check what changedInspections
An inspection or survey is coming.
Fire marshal, building, licensing or a customer audit. Find what the inspector will find while there is still time to fix it.
Get ahead of itInsurance
Your insurer sent a list.
Open loss-control recommendations and a renewal coming up. Turn the carrier's list into a closed, documented one.
Close out the listOwnership
You bought or took over a facility.
Get a baseline of what you actually own: what is permitted, what changed since, and what it costs to run.
Get a baselineFor manufacturing, food and beverage, warehouse and distribution, healthcare and care facilities, and data centers.
What a Records Review Finds
Paperwork, Equipment and Bills.
Read Together.
Each finding comes with what it costs you in compliance, safety and efficiency.
| Item | What the records say | What we found | Status |
|---|---|---|---|
| Air handler AHU-2 | Drawn in one location | Installed in another | Records mismatch |
| Line 1 motor | Circuit sized for the original equipment | New equipment needs more power | Power mismatch |
| Process water | Water bills rising month over month | No new load to explain it | Possible leak |
| Equipment label | Label on file for the original unit | Unit modified since | Label out of date |
| Item | What the records say | What we found | Status |
|---|---|---|---|
| Smoke barrier, east wing | Rated wall on the life safety plan | Renovation added penetrations with no firestopping record | Records mismatch |
| Procedure room | Ventilation designed for exam use | Room now used for procedures | Ventilation mismatch |
| Sprinkler coverage | Drawn for the original floor plan | Walls added in the last renovation | Coverage gap |
| Emergency power | Generator sized for the original equipment | Imaging equipment added since | Power mismatch |
Illustrative example, not client data. Findings are flagged from the documents and data you send. The site walk in step 2 confirms each one in the field.
Cost Improvement Program
Review. Plan. Fix.
Decide at Every Step.
No cost
Records review
You send records and utility data. We flag records that no longer match and signs of waste, such as mismatched power and possible leaks.
Based on documents provided.
Fixed fee, quoted first
Site walk and fix plan
We confirm what is installed, measure utilities and rank every fix by what it saves and what it costs. Then we walk you through the plan.
You see the price in writing before anything starts.
Engineering review and seal where required, by a licensed Texas PE at our partner engineering firm. Field evaluation and labeling included where equipment needs it.
Priced per fix you approve
Delivery of the fixes
We permit, build and close out the fixes you approve, with licensed partners for electrical and engineering scopes.
You choose what happens after each step. Need only a field evaluation, labeling or a site walk? Those are available on their own, no program required.
Recent Work
Fixes and projects
from our project log.
Shared by scope. Client names stay confidential.
- Underway
Phased facility improvement plan
A facility-wide corrective plan split into phases the owner approves one at a time, so the highest-risk items get fixed first.
- Completed
Production equipment installation
Process water and compressed air connected to new stamping equipment in an operating plant, with equipment foundations, licensed electrical work and site safety oversight, carried through closeout.
- Underway
Facility permits and new waterline
Permit applications prepared with our engineering partners, plus installation of a new waterline to serve the plant.
- Underway
Fire suppression options study
Options to protect a high-voltage room and production equipment from water damage, with permitting and fire marshal approval mapped for each.
The ACNA Method
A Closed Loop.
Not a Handoff Chain.
The people who assess the problem stay with the people who design, build and improve the fix.
Assess
Capture field conditions, operating constraints and the cost behind the problem.
Design
Plan a buildable fix that connects compliance, capacity and long-term value.
Execute
Coordinate the work around production, with clear ownership from permit to closeout.
Improve
Measure the result, close the loop and name the next highest-value move.
The result feeds the next assessment
Assessment and planning
Records review, field verification and a fix plan ranked by cost and risk.
Engineering sign-off
Every finding and design that needs engineering judgment is reviewed and sealed by a licensed Texas Professional Engineer.
Permitting and code compliance
Applications, plan review, certificate of occupancy changes and inspections, handled for you.
Construction and closeout
One project lead runs the schedule, the site and every trade through to closeout.
Licensed specialty trades
Electrical, fire sprinkler and mechanical work by licensed contractors, under our management.
Safety and field labeling
EHS oversight on every job, and NRTL field evaluations for unlisted or modified equipment.
Engineering is performed and sealed by licensed Texas PEs at our partner engineering firms.
What We Do
Every Phase.
One Team.
Cost Improvement Program
Records review, field verification and a fix plan ranked by total return.
See the programConstruction and build-out
Prime GC for fit-outs and facility modifications, with a dedicated project lead.
DetailsPermits and approvals
Applications, plan review responses, certificate of occupancy changes and inspections.
DetailsEquipment and systems
Install and commission equipment and utilities. Electrical by licensed electrical contractors.
DetailsField evaluation and verification
Labeling for unlisted or modified equipment, coordinated with NRTL partners, and site checks of what is installed. Available on their own.
DetailsSafety and compliance
EHS programs and site safety oversight, plus code reviews before you open.
Details
Get Started
Start With
What You Have.
Pick the request that fits. A person replies within one business day.
- 1A person from ACNA replies within one business day.
- 2You send your files the way that suits you. We can sign an NDA first.
- 3We review them and give you a delivery date for the findings.
- 4We walk you through each finding and what it costs. You decide what happens next.
Your request is ready to send
Copy the request below and email it to us, or call. A person replies within one business day.